2 Projects

Petkim Petro-Chemical Plant

Place İzmir
Start Date 1979
Completion Date 1983
Proje Hakkında

The construction and equipment installations of the High Density Polyethylene Production Unit, the Power Generation Plant and the Waste Treatment Plant Unit at  Petkim’s Petro-Chemical plant in Izmir, Aliaga were undertaken by KORAY. Contracted work in the Power Generation Plant was limited to the construction of the building. The major part of contracted work in the other two units consisted of structural steel construction and installation of a complex network of steel pipes, pressure tanks and underground piping.

Construction Area 27.748 m2